UNIVERSITY OF TEXAS AT SAN ANTONIO
6900 N LOOP 1604 W, SAN ANTONIO, TX, 78249
No open violations Compliance record — not a listed provider
Facility identity · canonical
- EPA Registry ID
- 110034326174
- RCRA Handler ID(s)
- TXD098829039
- Generator status
- Large Quantity Generator (LQG)
- County
- BEXAR
- EPA Region
- 06
- Active
- Yes
- NAICS
- 611310
- Coordinates
- 29.58083, -98.6275
Compliance summary · canonical · EPA source pulled Jul 2, 2026 · summary recalculated Aug 26, 2026
3-year compliance history Not in the compliance universe for any of the last 12 quarters
Not in universe In violation Significant non-compliance
- Significant non-complier
- No
- Last inspection
- Apr 12, 2018
- Inspections (5 yr)
- —
- Informal actions (5 yr)
- —
- Formal actions (5 yr)
- —
- Total penalties
- —
Permits & authorizations · canonical
| Program | Type | Status | Effective |
|---|---|---|---|
| RCRA | LQG | Not reported | Not reported |
Type is EPA's RCRA handler classification. Permit status and effective date
are not published in the RCRAInfo handler dataset.
Violations · canonical · 4 total, 0 open
4 distinct violation categories on record:
| Count | Code | Category | EPA description |
|---|---|---|---|
| 1 | 265.C | TSDF standards (interim status) | Interim Status Standards for Owners and Operators of HW TSDs: Preparedness and Prevention |
| 1 | 265.D | TSDF standards (interim status) | Interim Status Standards for Owners and Operators of HW TSDs: Contingency Plan and Emergency Procedures |
| 1 | 270.A | Permit requirements | EPA Administered Permit Programs: the HW Permit Program General Information |
| 1 | XXS | State-specific requirement (broader than federal) | State Statutory or Regulatory requirements that are broader-in-scope than the federal RCRA requirements |
All violations:
| Determined | Category | Status | Agency |
|---|---|---|---|
| Apr 12, 2018 | TSDF standards (interim status) 265.C · Interim Status Standards for Owners and Operators of HW TSDs: Preparedness and Prevention | Resolved Apr 20, 2018 | S |
| Apr 12, 2018 | TSDF standards (interim status) 265.D · Interim Status Standards for Owners and Operators of HW TSDs: Contingency Plan and Emergency Procedures | Resolved Apr 20, 2018 | S |
| Apr 12, 2018 | Permit requirements 270.A · EPA Administered Permit Programs: the HW Permit Program General Information | Resolved Apr 25, 2018 | S |
| Apr 12, 2018 | State-specific requirement (broader than federal) XXS · State Statutory or Regulatory requirements that are broader-in-scope than the federal RCRA requirements | Resolved Apr 20, 2018 | S |
Inspection history · canonical · 4 total
| Date | Type | Agency | Outcome |
|---|---|---|---|
| Apr 12, 2018 | COMPLIANCE EVALUATION INSPECTION (CEI) | S | Violation found |
| Apr 12, 2018 | FOCUSED COMPLIANCE INSPECTION (FCI) | S | In compliance |
| Jul 7, 2009 | FOCUSED COMPLIANCE INSPECTION (FCI) | S | In compliance |
| Jul 7, 2009 | NON-FINANCIAL RECORD REVIEW (NRR) | S | In compliance |
Related facilities near San Antonio
Data sources
EPA ECHO — this facility's detailed report — facility, compliance summary, permits, evaluations & violations
RCRAInfo evaluation and violation records for this facility are integrated into the
ECHO report linked above — RCRAInfo's own public search doesn't offer a stable
per-facility link. General source: EPA ECHO, EPA RCRAInfo.
Compliance, permit, and location data come straight from EPA and can't be edited.
Contact info and description come from the business's claimed listing, if any.
This profile is not an official regulatory determination.
- EPA ECHO Exporter
- Source snapshot pulled Jul 2, 2026 · batch 20260702T154139Z
- EPA RCRAInfo (ECHO download)
- Source snapshot pulled Jul 2, 2026 · batch 20260702T154139Z
Two different dates can appear on this page, and both are correct but mean different
things: "Source snapshot pulled" above is when we last pulled that source's raw data
— this is the date to check for source currency. "Recalculated" on the compliance
summary is when we last recomputed that summary from the data on hand, which can
land on a later date than the source pull itself — a later recalculation date does
NOT mean the underlying source has data through that date.