KADDIS MANUFACTURING CORP

1175 BRAGG STREET, HONEOYE FALLS, NY, 14472
No open violations Compliance record — not a listed provider
Compliance record, not a business listing. This facility is a hazardous-waste generator (it produces regulated waste as part of an unrelated business), not a waste-management vendor — it isn't eligible to be claimed or listed. Data below is shown for compliance transparency, sourced from EPA ECHO & RCRAInfo.

Facility identity · canonical

EPA Registry ID
110004339859
RCRA Handler ID(s)
NYD002208882
Generator status
Very Small Quantity Generator (VSQG)
County
MONROE
EPA Region
02
Active
Yes
NAICS
332721
Coordinates
42.93654, -77.57693
Compliance summary · canonical · EPA source pulled Aug 11, 2026 · summary recalculated Aug 26, 2026
3-year compliance history In violation 1 of the last 12 quarters
Not in universe In violation Significant non-compliance
Significant non-complier
No
Last inspection
Oct 3, 2023
Inspections (5 yr)
2
Informal actions (5 yr)
2
Formal actions (5 yr)
—
Total penalties
—
Permits & authorizations · canonical
ProgramTypeStatusEffective
RCRA CESQG Not reported Not reported
Type is EPA's RCRA handler classification. Permit status and effective date are not published in the RCRAInfo handler dataset.
Violations · canonical · 7 total, 0 open
4 distinct violation categories on record:
CountCodeCategoryEPA description
4 262.A Generator standards Standards Applicable to Generators of HW: General
1 261.A RCRA 261.A ID and Listing of HW: General
1 262.B Generator standards Standards Applicable to Generators of HW: Manifest Requirements Applicable to Small and Large Quantity Generators
1 262.C Generator standards Standards Applicable to Generators of HW: Pre-Transport Requirements Applicable to Small and Large Quantity Generators
All violations:
DeterminedCategoryStatusAgency
Feb 15, 2024
Generator standards
262.C · Standards Applicable to Generators of HW: Pre-Transport Requirements Applicable to Small and Large Quantity Generators
Resolved Mar 28, 2024 S
Aug 4, 2021
RCRA 261.A
261.A · ID and Listing of HW: General
Resolved Aug 30, 2021 S
Jan 28, 2005
Generator standards
262.A · Standards Applicable to Generators of HW: General
Resolved Mar 28, 2005 S
Jan 28, 2005
Generator standards
262.B · Standards Applicable to Generators of HW: Manifest Requirements Applicable to Small and Large Quantity Generators
Resolved Mar 28, 2005 S
Aug 23, 2001
Generator standards
262.A · Standards Applicable to Generators of HW: General
Resolved Sep 10, 2003 S
Apr 24, 1990
Generator standards
262.A · Standards Applicable to Generators of HW: General
Resolved Jun 11, 1990 S
Mar 14, 1986
Generator standards
262.A · Standards Applicable to Generators of HW: General
Resolved Jun 16, 1986 S
Inspection history · canonical · 8 total
DateTypeAgencyOutcome
Oct 3, 2023 COMPLIANCE EVALUATION INSPECTION (CEI) S Violation found
Aug 4, 2021 COMPLIANCE EVALUATION INSPECTION (CEI) S Violation found
Jan 28, 2005 COMPLIANCE EVALUATION INSPECTION (CEI) S Violation found
Sep 10, 2003 NO LONGER A SIGNIFICANT NON-COMPLIER (SNN) S In compliance
Feb 21, 2002 SIGNIFICANT NON-COMPLIER (SNY) S In compliance
Aug 23, 2001 COMPLIANCE EVALUATION INSPECTION (CEI) S Violation found
Apr 24, 1990 COMPLIANCE EVALUATION INSPECTION (CEI) S Violation found
Feb 12, 1986 COMPLIANCE EVALUATION INSPECTION (CEI) S Violation found

Data sources

EPA ECHO — this facility's detailed report — facility, compliance summary, permits, evaluations & violations
RCRAInfo evaluation and violation records for this facility are integrated into the ECHO report linked above — RCRAInfo's own public search doesn't offer a stable per-facility link. General source: EPA ECHO, EPA RCRAInfo.
Compliance, permit, and location data come straight from EPA and can't be edited. Contact info and description come from the business's claimed listing, if any. This profile is not an official regulatory determination.
EPA ECHO Exporter
Source snapshot pulled Aug 11, 2026 · batch 20260811T113837Z
EPA RCRAInfo (ECHO download)
Source snapshot pulled Aug 11, 2026 · batch 20260811T113837Z
Two different dates can appear on this page, and both are correct but mean different things: "Source snapshot pulled" above is when we last pulled that source's raw data — this is the date to check for source currency. "Recalculated" on the compliance summary is when we last recomputed that summary from the data on hand, which can land on a later date than the source pull itself — a later recalculation date does NOT mean the underlying source has data through that date.